Cosmomusivo

  • Projects
  • Workshop/Studio
    • About cosmomusivo
    • New Construction
    • Restoration
    • Percent for Art Projects
    • Mosaic with young people
    • Mosaic Materials
    • Mosaic Techniques
  • News/Events
    • Courses
  • Contact
  • Deutsch

Globe

7. December 2017 by Cosmomusivo

Globe by the artist Schulze-Seehof in 1960

2016

Restoration of the globe

The globe was made in 1960 by the artist Gerhard Schultze -Seehof

material: Smalti, direct technique
state before restoration:  a lot of dirt and moss, missing tesserae
measures: cleaning,  supplementing the missing tesserae
location: Anna-Lindh-Grundschule, Berlin

Globe by the artist Schulze-Seehof in 1960
pacific ocean after the restoration
Globe by the artist Schulze-Seehof in 1960
Globe by the artist Schulze-Seehof in 1960
damaged North America
Globe by the artist Schulze-Seehof in 1960
pacific ocean
Globe by the artist Schulze-Seehof in 1960
South America
Globe by the artist Schulze-Seehof in 1960
Globe by the artist Schulze-Seehof in 1960
globe after restoration in 2016, detail
Globe by the artist Schulze-Seehof in 1960
globe after restoration
Globe by the artist Schulze-Seehof in 1960
damaged South America
Globe by the artist Schulze-Seehof in 1960
damaged pacific ocean
Globe by the artist Schulze-Seehof in 1960
Globe by the artist Schulze-Seehof in 1960
damages
Globe by the artist Schulze-Seehof in 1960
...cleaning

Restoration of Floor Mosaic, Villa Weigang

17. April 2016 by Cosmomusivo Leave a Comment

2016

Restoration of floor mosaic, Villa Weigang

Material: marble; black, white, green, gray, yellow, red, stone size about 15×15 mm
State before restoration: deficient supplements in cracks
Carried out measures : Removal of deficient supplements, fitting of new tesserae, polishing and impregnation
Location: Villa Weigang, Bautzen

Geöffnete Fugen vor dem Einsetzen der Steine
Während der Arbeit am Fussboden
Zustand nach Restaurierung
Zustand nach dem Aufschneiden schadhafter Stellen
Zustand nach Restaurierung
Zustand nach Herausnehmen schadhafter Stellen
Zustand nach Restaurierung
Zustand während Restaurierung

Restoration of Tomb Mosaic: Angel with Palm Branch

15. April 2016 by jeffreytoller Leave a Comment

2012

Mural tomb mosaic: Angel with Palm Branches, Puhl und Wagner 1896

Material: smalti, gold
Design: Paul Mohn
State before restoration: defect grout, and missing tesserae, strong soiling in the bottom
Measures: cleaning, supplementing the missing parts and loose tesserae, grouting
Location: Gravestone Therese Möbius, Grunewald cemetary, Berlin

Angel with palm leaf nade in 1895 before restoration
Engel mit Palmzweig vor der Restaurierung- Schäden
Angel with palm leaf
Angel with palm leaf after restoration
Engel mit Palmzweig, nach Restaurierung
Angel with palm leaf
Angel with palm leaf after restoration.
Engel mit Palmzweig nach der Restaurierung, FFriedhof Grunewald
Angel with palm leafs.

Tesselated Floor Restoration: St.Mary´s Chapel

14. April 2016 by jeffreytoller Leave a Comment

mosaic floor, after restoration with new made picture of the snake and new made "Temperantia"

2012

Tesselated floor restoration, St. Mary`s chapel, made by Antonio Gobbo 1895

Design: Friedrich Stummel
Material: marble, natural stone, tile size ca. 10×10 mm
State before restoration: heavy abrasion with large defective surfaces and missing image fields, defective grout
Measures: Cleaning, completing of surface defects, incorporating new tesselated image fields, polishing and impregnation
Location: Place of pilgrimage, Kevelaer
in cooperation with Restauratoren Karthäuserhof, Köln

Mosaik Floor Gnadenkapelle Kevelaer before the restoration in 2011
Historical photograph of the visualisazion of Temperance, 1950
The made-to historical photographs design for the image field of Temperantia
The finished new added virtue " Temperantia"
Gnadenkapelle Kevelaer, working on the mosaic
Working on the mosaic for Kevelaer in the Studio.
manufacturing ornamental ribbon
cut-out for onamental ribbon
cut-out for onamental ribbon
installation of the complemented mosaic
Installation of the complemented mosaic
installed ornamental ribbon
New caned ornamental ribbon in front of the altar.
The finished mosaic with the snake and the apples.
mosaic floor, after restoration with new made picture of the snake and new made "Temperantia"
Gnadenkapelle Kevelaer, mosaic floor, after restoration with new made picture of the snake and new made "Temperantia"
mosaic floor Kevelaer, "In cades" crown
Gnadenkapelle Kevelaer, "In Cades" with restored crown, detail
  • 1
  • 2
  • 3
  • Next Page »
  • Projects
  • Workshop/Studio
  • News/Events
  • Contact
  • Deutsch

Copyright © 2025 · Impressum · Datenschutz · Cosmomusivo, Prinzenstr. 85 F, 10969 Berlin · Facebook

Copyright © 2025 · Minimum Pro Theme on Genesis Framework · WordPress · Log in